Top Challenges Hospitals Face When Developing Real Estate

Hospitals and medical systems are constantly evolving, and with that comes the need for renovating existing spaces and building new facilities. However, healthcare construction presents unique challenges that set it apart from traditional real estate projects. From strict regulatory requirements to the complexities of working within an active hospital environment, these projects are high-stakes and demand precise execution. These are some of the top challenges hospitals and healthcare systems face when undertaking renovation and new construction projects, and how they manage to navigate these obstacles.

Balancing Construction with Ongoing Patient Care

One of the biggest challenges hospitals face is the need to maintain uninterrupted patient care during renovations or new construction. Unlike other types of commercial real estate, hospitals operate 24/7 and often have no downtime for major construction efforts. Ensuring patient safety and comfort while managing noise, dust, and disruptions can be incredibly complex.

Hospitals typically use phased construction strategies to tackle this challenge. For example, a hospital might close off one floor or wing for renovation while keeping the rest of the facility fully operational. Temporary barriers, noise control measures, and advanced scheduling are key tactics used to minimize disruption to patient care.

However, this approach can create logistical bottlenecks, such as rerouting patient traffic and emergency vehicles, which require meticulous planning and real-time adaptability. Hospitals must ensure that critical areas like emergency departments, intensive care units, and surgery rooms are always fully functional, which puts immense pressure on construction teams to work around these spaces.

Strict Regulatory and Compliance Requirements

Healthcare is one of the most heavily regulated industries, and hospital construction projects are no exception. Hospitals must adhere to stringent building codes and healthcare-specific regulations, such as those from the Joint Commission, Centers for Medicare & Medicaid Services (CMS), and local building authorities. Compliance with infection control standards, patient safety regulations, fire safety, accessibility (ADA), and energy codes makes hospital construction far more complex than typical commercial projects.

For example, during renovations, dust and debris can become vectors for infection, particularly in sensitive areas like operating rooms and intensive care units. Hospitals must follow Infection Control Risk Assessments (ICRA) protocols to mitigate these risks. This often means installing specialized filtration systems, creating negative pressure zones, and even rerouting HVAC systems to isolate construction areas.

The costs and delays associated with meeting these regulations can significantly impact project timelines and budgets. Construction teams must work closely with hospital compliance officers to ensure every phase meets rigorous standards.

Managing Costs and Funding Constraints

Hospital construction projects are incredibly expensive, and many healthcare systems operate on tight budgets. With the rising costs of labor, materials, and technology, cost overruns are a constant risk. Additionally, hospitals may be operating with limited public or private funding, which puts pressure on them to justify the ROI for new buildings or renovations.

Financing such large-scale projects is a challenge, and hospitals often rely on a mix of capital funding, public bonds, philanthropic donations, and even public-private partnerships (PPP) to secure the necessary funds. Any delays or regulatory issues can cause financial strain, especially if a hospital is dependent on a phased completion timeline for new revenue streams (like opening a new wing or specialty center).

Hospitals must also consider the long-term operational costs of their buildings. This includes budgeting for ongoing maintenance, energy consumption, and staff for new facilities. To mitigate the risk of cost overruns, many hospitals use value engineering—a process that evaluates alternative construction methods or materials to find cost savings without sacrificing quality or safety.

Technological Integration and Future-Proofing

Modern hospitals rely heavily on technology, not only for patient care but for facility operations as well. One of the major challenges during hospital construction is integrating advanced medical technology, building management systems (BMS), and digital infrastructure into the facility’s design. This means constructing hospitals that can accommodate high-tech medical equipment, data centers, telemedicine capabilities, and even smart building technology like automated lighting and HVAC systems.

However, designing around today’s technology also poses the challenge of future-proofing hospital facilities. Healthcare technology evolves rapidly, and what’s cutting-edge today might be obsolete in a few years. Hospitals need to plan for future upgrades without major renovations every time a new piece of technology comes online. For example, modular design elements—such as plug-and-play walls for diagnostic rooms—allow for easy upgrades without a full teardown.

But even with modular designs, balancing current needs with future scalability requires careful planning and collaboration between hospital administrators, medical professionals, architects, and technology consultants. Without proper integration from the beginning, hospitals risk costly upgrades in the future.

Staff and Stakeholder Coordination

Hospital construction projects require input and coordination from a wide range of stakeholders. Medical staff, administrators, architects, engineers, contractors, and government agencies all have a vested interest in the project’s success. However, aligning these different perspectives—each with its own set of priorities—can be difficult.

Physicians, nurses, and hospital staff often have specific needs regarding patient flow, room layouts, and access to equipment that must be balanced with the realities of construction and budget constraints. There is often a gap between what the healthcare professionals envision as ideal for patient care and what the construction team can deliver based on practical limitations.

Frequent communication and collaborative project management are essential for keeping everyone on the same page. Hospitals increasingly use tools like Building Information Modeling (BIM) to create detailed, 3D models of the project that allow stakeholders to visualize the final product. These models help identify potential issues before construction begins and give medical professionals a more hands-on role in shaping the design process.

Infection Control During Construction

Infection control is a significant challenge during hospital renovations or expansions. Construction can stir up dust, debris, and pathogens, which can spread into patient care areas if not properly contained. Ensuring that patients, staff, and visitors are not exposed to airborne contaminants during construction is a top priority, especially in sterile environments like operating rooms and intensive care units.

In addition to the ICRA protocols mentioned earlier, hospitals often rely on negative pressure environments, HEPA filters, and physical barriers to contain dust and contaminants. However, this adds complexity to the construction process, as contractors must work within highly controlled environments. Workers often need to follow strict infection control protocols, including using specialized cleaning equipment, wearing protective gear, and maintaining clean construction zones.

The need to uphold these strict infection control standards can cause delays and add additional costs to projects, as construction crews must be carefully trained and monitored throughout the entire process.

Sustainability and Environmental Impact

In recent years, hospitals have become more conscious of their environmental footprint, and sustainability is now a key consideration in healthcare construction. Hospitals are massive consumers of energy, water, and resources, so building a new facility with an eye toward sustainability can reduce long-term operating costs and contribute to a healthier environment.

However, incorporating sustainable practices into hospital design and construction presents its own challenges. Achieving Leadership in Energy and Environmental Design (LEED) certification or building a net-zero facility requires careful material selection, energy-efficient design, and advanced technology integration.

Hospitals like Seattle Children’s Hospital have embraced sustainable construction by incorporating green roofs, energy-efficient lighting systems, and water recycling initiatives. However, these features can increase upfront costs and require specialized expertise during the planning and construction phases.

Balancing sustainability goals with the need for high-performance, mission-critical infrastructure means hospitals must work closely with sustainability consultants, architects, and contractors to meet both operational and environmental objectives.

Things to Consider When Delivering Medical Real Estate Project

Renovating and constructing new hospital real estate is one of the most complex and challenging endeavors in real estate development. Hospitals must navigate strict regulations, balance costs, coordinate multiple stakeholders, and manage construction in active healthcare environments—all while maintaining high standards for patient care. By employing advanced planning strategies, phased construction, modular design, and cutting-edge technology, hospitals are meeting these challenges head-on, building the next generation of healthcare facilities that are safer, more efficient, and better equipped for the future.